The Agric -Isawo -Konu- Arepo Road will have a link bridge that will connect the state to the Ogun State boundary, which will link the Lagos-Ibadan Expressway.”

The Permanent Secretary, Ministry of Works and Infrastructure, Temidayo Erinle, said the first phase of the road construction would begin 400 metres from the Ikorodu Road at Agric bus stop, with a total length of over seven kilometres.

The analysis plenty, but na the main matter be that.